TAKENAKA TOPICS 2009 winter
ORE Sapporo Building
 |
The symbolic and modern exterior appearance design of this building consists of a dark gray and white monotone. The front of the building is laid out with fine spaces of the glass openings between the columns. The wider spaces of the glass openings between the columns on the sides of the building give the architecture a characteristic exterior appearance. Large-span steel beams run across the building from the external columns to the core, realizing inside office space without columns with a high degree of flexibility.
- Client
- :ORIX Real Estate Corporation
- Location
- :North 2, West 1-1-7, Chuo-ku, Sapporo City, Hokkaido
- Design
- :PLANTEC Architects Inc. (Building design), Takenaka Corporation (Structure & equipment design)
- Construction
- :Takenaka Corporation
- Structure
- :Steel-framed reinforced concrete, PC, Steel, and Reinforced concrete
- Number of floors
- :12 fl. above and 1 fl. below ground
- Total floor space
- :16,689m²
|
Narita Shiyakusho-mae Keisei Building
 |
This project entailed constructing a new building with a tenant, the Richmond Hotel (RNT Holdings), in front of the Keisei Line Narita Station. Aiming at foreign tourists from Narita Airport, a design based on "Japanese style" was used for the approach, with shadows created by the latticework, and the first floor multilayered lobby space, reaching from the exterior through to the end of the building. The building has a fine-featured exterior appearance in the image of bamboo and tiles in what is a rich, green environment. With the theme of resetting body and mind, the neutral interior displays an opened-up space using milky white colors and simple, natural materials.
- Client
- :Keisei Electric Railway Co., Ltd.
- Location
- :970 Hanazaki-cho, Narita City, Chiba Prefecture
- Design & Construction
- :Takenaka Corporation
- Structure
- :Steel and Reinforced concrete
- Number of floors
- :10 fl. aboveground
- Total floor space
- :6,663m²
|
KDX Nagoya Sakae Building
 |
Facing "Hirokoji-dori," the main street in Sakae area, the center of Nagoya, this office building has been constructed making maximum use of the site. The building was designed for differentiation with other office buildings, as vacancy rates continue to rise due to the economic recession in recent years. In order to do so, a base isolation structure was used, with an A-class "CASBEE" design, including a roof garden as a refreshing space, a noncontact-type card security system, an inside-building type multilevel parking structure, and an entrance hall design and interior/exterior finishing with a sense of luxury and high-grade specifications. In order to keep the work period as short as possible and because the streets in the city center are so narrow, many challenges had to be overcome, including the installation of the multilevel parking structure at night and accurate maintenance of the base isolation.
- Client
- :Wood Friends Co., Ltd.
- Location
- :4-5-3 Sakae, Naka-ku, Nagoya City, Aichi Prefecture
- Design
- :K-Plan Corporation
- Construction
- :Takenaka Corporation
- Structure
- :Steel
- Number of floors
- :11 fl. aboveground
- Total floor space
- :10,848m²
|
Yotsuya TN Building
 |
- Client
- :TODEN Real Estate Co., Inc. and Nippon Life Insurance Company
- Location
- :16-1 Samon-cho, Shinjuku-ku, Tokyo
- Design
- :Takenaka Corporation
- Construction
- :TN Yotsuya 3-chome Bldg JV (Fujiki Komuten Co., Ltd.)
- Structure
- :Steel and Steel-framed reinforced concrete
- Number of floors
- :11 fl. above and 1 fl. below ground
- Total floor space
- :11,653m²
|
NOK Fukushima Plant New 1st Factory
 |
This project entailed the reconstruction of the main plant of a manufacturer of oil seals used in cars. In order to rectify the flow of the line from production through to shipment, as well as secure flexibility for the future, preproduction and postproduction spaces were laid out east to west each in the 200-meter long and 40-meter wide column-free space with the distribution zone and truck yard in the southern area. The equipment, which is the source of a lot of noise, was consolidated in a line in the center of the roof, designed to give consideration to the neighborhood and optimize the infrastructure route. The height of the western side of the building, which faces a residential area, was kept low to reduce any oppressive feeling, and the horizontal rows of windows and glass box bay windows give the long, large elevation surface rhythm.
- Client
- :NOK Corporation
- Location
- :8 Nagaikawa, Fukushima City, Fukushima Prefecture
- Design & Construction
- :Takenaka Corporation
- Structure
- :Steel
- Number of floors
- :2 fl. aboveground
- Total floor space
- :22,802m²
|
Asahi Facilities Technical Training Center
 |
This is the technical training center of a real estate and building management company. Mockups of the equipment and machinery systems found in buildings of around 15,000 square meters in size have been installed in the building with the objective of training the employees for the expertise they require during ordinary operations and also during emergencies. The exterior uses wooden louvers that have been recycled from the Hokkaido Toyako Summit Media Center, and large-scale wall greening has been carried out, designed for harmony with the rich, green surrounding environment and landscape.
- Client
- :Asahi Facilities Inc.
- Location
- :41-1 Yanagitani, Kawanishi City, Hyogo Prefecture
- Design & Construction
- :Takenaka Corporation
- Structure
- :Reinforced concrete
- Number of floors
- :2 fl. aboveground
- Total floor space
- :629m²
|
