HOME / News Release / News Release 2001
News Release 2001
- 12.20
- The "Takenaka Green Building System," Aiming for Factor 10 by 2010
- 11.26
- Order Received for Construction of New Passenger Terminal Building at Thailand's Suvanrnabumi International Airport
- 11.12
- Ecofriendly Construction Material Made 100 Percent From Industrial By-Products
- 10.23
- Stable Sales of More Than 200 "TACMI" Active Microtremor Isolation System Units
- 10.11
- Interior Design of "Hotel Kintetsu Universal City" Receives the "Asia Grand Prize" in the "Asia Du Pont Antron Design Awards"
- 10.11
- Takenaka Receives Contract for the Commercial Planning and Design Work for "Ocean Terminal," the Largest Commercial Facility in the Hong Kong Harbor Front District
- 10.11
- Verification Tests Begun of Business Solution for Corporate Clients Using the "FOMA" Third Generation Mobile Communication Service
- 09.27
- Total Building Bobbing "Stepping Structure" First Used in Downtown Building
- 09.14
- Interim Closing of Accounts for Fiscal 2001 and Performance Forecasts for Current Term
- 09.12
- Heat Island Phenomenon Proven to Be Alleviated by Rooftop Greening
- 09.11
- Development of an Innovative Steel Pile Joining and Driving System, The "Flash Piling System," Suitable for Earthquake Strengthening
- 09.04
- Wind Speed of Typhoon No. 11 Measured at Altitudes Between 250 - 3,000 Meters
- 08.27
- Groundwater Levels Controlled to a Centimeter 24 Hours a Day
- 08.21
- Japan's First "Flat Slab Base-Isolated High-Rise Condominium Building" Under Construction
- 08.03
- visiMax, a New Visual Simulator Developed
- 07.25
- "EZ boring," a Rotary Boring Machine Developed for Analyzing Polluted Soil
- 07.24
- "TRAIN," an Earthquake Risk Assessment System Developed
- 07.24
- Highest Base-Isolated Superhigh-Rise Condominium in the World to Be Built
- 07.13
- "Drive-Through Tunnel Concrete Inspection and Diagnostic System" Developed for Noncontact and Nondestructive Checking of Defects
- 07.09
- Proposal for Logical Design Method for Piles in Ground Where Liquefaction Occurs
- 07.05
- Order Received from General Dental Instrument Trading Company Morita Corporation for East Japan Distribution Center Supporting SCM
- 07.05
- Production and Distribution Remote Monitoring System Developed
- 07.05
- Hybrid Base Isolation System Used in Superhigh-Rise Office Building for the First Time in the World
- 06.29
- NSC Beams Without Fireproof Coating Used Under New Building Standards for First Time
- 06.27
- Takenaka Releases Its Environmental Report, "Takenaka e-Report 2001"
- 06.27
- Takenaka's Proposal Receives Special Selection Prize (Land, Infrastructure and Transport Minister Prize) at Urban Planning Design Contest
- 06.25
- "LIGHT SPACE ARCHITECTURE - Modern Architecture in Sweden," Photo Exhibition by Yukio Yoshimura
- 06.14
- "Electromagnetic Wave Absorbing Paving" Developed As a Measure Against Road Electromagnetic Waves
- 06.14
- Superhigh-Rise PC Structure Design Possible Using a "3-D Dynamic Response Analysis Program for PC Structures"
- 06.14
- "Office Renewal Planning Support System Based on Building Performance Evaluation" Developed
- 06.07
- Construction of an "Insect Search System," to Help Insect Proofing of Manufacturing Facilities
- 06.07
- Development of a "Far-Infrared Heat Sterilization Unit" to Sterilize the Floors of Food Processing Plants
- 05.11
- Development of the "Steel Flash Welding System"
- 05.09
- "t's harajuku" to win Top Award in International Design & Development Awards Program sponsored by ICSC
- 04.25
- "Total Construction Waste Material Routine Collection System" Built
- 04.17
- "Stairway Air Supply Pressurized Smoke Blocking System" Developed and Put into Use at JTB Building
- 04.13
- "BRAIN," a New Structural Design System Developed
- 04.06
- Nippon Budokan Makes a "Strong and Beautiful" New Debut
- 04.04
- Confectionery Plant with 20 Small Wind Power Generators, the Most in Western Japan
- 04.04
- First Interfacing System Developed Between PHS Phones and Building Equipment
- 03.23
- Rooftop Greening Taking Advantage of Plant Characteristics and Not Requiring Care
- 03.22
- Overview of Fiscal 2000 Closing of Accounts and Performance Outlook for Fiscal 2001
- 03.05
- Creation of "Stepping Vibration Control," a Reverse Concept for Improved Seismic Resistance
- 03.05
- "Ruins Museum" Concept to Transform Ruins into a Museum
- 03.05
- Maintenance-Free Vibration-Control Damper Developed
- 02.23
- Grand Opening of "YM SQUARE HARAJUKU" on January 27
- 02.21
- "Multipurpose System for Using Snow Cold Thermal Storage" Developed
- 02.21
- Medium-Level Wooden-Structure Office Building Developed
- 02.08
- Structural System for Porous-Type High-Density Dwelling Models
- 02.08
- Acoustic Method for Measuring Room Temperature Distribution
- 02.07
- Ecofriendly Soil Cement Continuous Diaphragm Wall Method
- 01.05
- Verification Completed of the Retractable Membrane Roof of Oita Sports Park Main Stadium
