HOME / News Release / News Release 2007


News Release 2007

11.29
146 Corporate Facilities Department Representatives Attend the “Workplace Seminar 2007”
11.28
“Multipurpose High-Performance AE Water Reducing Agent for Reduced Shrinkage in Concrete” Developed, Reducing Concrete Dry Shrinkage by 20 Percent
11.12
“Soil Cement Wall Method” Developed, Reducing Construction Waste sludge by Around 40 Percent
11.02
Totally Produced by Takenaka, the “GYRE” Commercial Facility Opens
10.31
“Double-Layered Floor Storage-Type Structural Control System” Able to be Installed in Narrow Spaces Such as OA Floor Pockets
10.12
“Corrugated Steel Plate Earthquake-Resisting Walls,” New Industry Technology, Used in Two Projects
10.02
Total Support Being Provided by Takenaka: from Site Selection through to Design, Construction, and Production Line Start-Up
09.07
The Only General Contractor with a System Able to Meet the Full Requirements of Soil Remediation
09.06
Supporting Energy Conservation Activities to Reduce Greenhouse Gas Emissions, as Socially, Legally and Economically Required of Building Owners
08.31
Interim Closing of Accounts for Fiscal 2007 and Performance Forecasts for Current Term
08.23
Large-Scale Building-Moving Project at Koen Girls’ School, and a New School Building to Be Constructed on the Old Site
08.06
Takenaka’s “Insect Proofing Technology” Receives an “Engineering Merit Award”
06.04
Approval Received for the “Multilevel Expanded-Diameter Pile Method,” Displaying Powerful Support St
04.26
Development of a New “Hybrid Tower Crane” Combining Accumulator and Commercial Power Source
04.25
Completion of a New Plant for ECOVER (Belgium), the worldwide leading manufacturer of ecological was
04.17
The PLC (Power Line Communication) System Approved in Fall 2006 Installed in the Employee Dormitory
04.09
Sales of the “TACMI®” Active Microtremor Isolation System Exceeds Four Hundred Units
04.05
“Secure FAB Works,” a Package of 51 Products and Technologies for Digital Product Plants
03.29
GYRE - A New Commercial Establishment in Omotesando
03.28
Takenaka’s Cutting-Edge Technology Showroom “i³”
03.23
Viscous Base Isolation® System Used at “Yokogawa Electric Corporation Sagamihara Office”
03.20
Display at the JFMA Forum 2007
03.19
Overview of Fiscal 2006 Closing of Accounts and Performance Outlook for Fiscal 2007
02.22
Renewal of the Takenaka Web Site Top Page
02.09
Multistructural Control of Shaking due to Major Earthquakes or Strong Winds, Using One Device
01.30
Large-Scale Disaster Exercise Completed Based on the Business Continuity Plan (BCP)

Page Top