Major Works
Daikin Europe Research and Development Center (EDC) in Ghent
|
|
Belgium 2024 |
|---|
- Basic Design & Supervision
- TAKENAKA Europe GmbH, Belgium Branch
- Construction
- TAKENAKA Europe GmbH, Belgium Branch
- Total floor area
- 30,600 ㎡
- Structure
- RC, 14Fl. above ground and 2 basement floor














